G. STEVEN GILREATH 605 Blackburn Dr., Knoxville, Tn. 37934 Cell - 865-250-1300 E-mail - mr44sg@gmail.com Formerly Site
Project Controls Manager for Burns & McDonnell, Alliant Energy’s, Ottumwa
Generating Station, Ottumwa, Iowa. (Professional Employment Group) Formerly Director of Cost & Acting Director of
Estimating, Parsons I &T Oak Ridge, Tennessee office Thirty years experience in the field of project
control and planning incorporating earned value management systems (EVMS)
developing project baselines, work breakdown structures (WBS) and performing
variance analysis using performance metrics (BCWS, BCWP & ACWP). Nuclear
engineering reporting and management coordination of Nuclear Regulatory
Commission (NRC) reporting. Ten years combined experience in the fields of
multi-discipline Engineering, Architecture, & Landscape Architecture as a
Design Draftsman, also as the former owner / operator of CSE, inc., a Design
/ Build Construction business. NRC
Clearance: “Q” (inactive)
DOE Clearance: “Q”
(inactive) EXPERIENCE Management/Coordination ·
Field Project Controls Manager for Burns & McDonnell’s Ottumwa
Generating Project ·
Site Scheduling Manager With GUBMK,TVA Cumberland SP, Fall 2011 Outage ·
Cost & Scheduling Consultant/Analyst for all DOE, ORO-EM projects ·
GLE Nuclear Fuels project Lead Scheduler for project master plan.
($2.2 Billion Project)
Planning, Cost & Scheduling
Infrastructure
Computer Experience
CAREER
HISTORY Jan. 2012- June 2013 Site Project Controls Manager, Burns & McDonnell Burns & McDonnell EPC contractor, Alliant
Energy’s, Ottumwa Generating Station, Ottumwa, Iowa. Scrubber / Bag House
Construction Addition. Jul. 2011- Jan. 2012 Site Scheduling Manager, GUBMK (Worley Parsons) TVA’s Cumberland Generating Plant Fall Outage Dec. 2009- Jun. 2011 Project Cost and Schedule Consultant, Project Time
& Cost (PT&C) Principle EVMS Scheduling Analyst for Environmental
Restoration Projects for the entire DOE Oak Ridge Operations Nov. 2008-Nov.2009 Project Controls Specialist Omega Consultants Lead Cost & Schedule Engineer for a $2.2B Nuclear
Fuels Project Seconded to GE Nuclear Fuels Group Aug. 2001-Nov. 2008 Project Controls Specialist BWXT Y12 Secondary
Readiness Campaigns, Capital Projects and Uranium Purification Facility (UPF)
Project Aug. 1992- Aug. 2001 Parsons I & T Supervisor of Cost and Acting
Director of Estimating Principal Project Controls Engineer with Parsons
I&T, Charlotte N.C. and Oak Ridge Tenn. Principal Project Controls Engineer with Parsons
I&T, City of San Diego, Ca. Water Department Capital Improvements
Project. San Diego, Ca. Principal Project Controls Engineer with Parsons,
Saudi Arabian Parsons Ltd., Abque, Saudi Arabia. Principal Project Controls Engineer with Parsons
Power, Florida Power C.R.Unit #3, Crystal River, Fla. Principal Project Controls Engineer with Parsons,
Hurricane Recovery Managers, St. Thomas U.S.V.I. Principal Project Controls Engineer with Parsons
I&T, Oak Ridge Tenn. LMES Facilities Waste Management Program. Project Scheduling Engineer with
Gilbert/Commonwealth, Oak Ridge, Tenn. TVA Fossil and Hydro projects. Project Scheduling Engineer with
Gilbert/Commonwealth, Oak Ridge, Tenn. MMES Advanced Neutron Source Reactor
Project. Project Scheduling Engineer with
Gilbert/Commonwealth, Oak Ridge Tenn. MMES ER Program - Two Tours of service
at Portsmouth, Ohio site. Project Scheduling Engineer with
Gilbert/Commonwealth, Oak Ridge Tenn. MMES ER Program - all Oak Ridge sites Feb. - Jul 1992 Project Scheduling Engineer with Mid West Tech, Oak
Ridge National Lab, Environmental Restoration Program X-10 and K-25 sites.
Oak Ridge, Tennessee. Department of Energy (DOE) facilities. 1991-1992 Project Controls Manager for Chattanooga Operations
Center, UE&C, Chattanooga, Tenn. Nuclear, Fossil & Hydro &
Industrial. Project Control Engineer, cost & scheduling
chemical & process, UE&C, Knoxville, Tenn. 1990-1991 Project Control Engineer, Savannah River Site (SRS),
Aiken, S.C. United Engineers & Constructors C-Reactor K Reactor Mods & Seismic Improvement Project 1987-1989 Project Control Specialist, U.S. Tennessee Valley
Authority, Knoxville, Tenn. Worked Unit #2 Restart Sequoyah Nuclear Project
Bellefonte, Watts Bar and Browns Ferry Nuclear Projects 1982-1987 Project Control Technician, U.S. Tennessee Valley
Authority, Knoxville, Tenn. Sequoyah and Bellefonte Nuclear Projects 1981-1982 Drafting Lead - Drafting Services, U.S. TVA,
Knoxville, Tennessee Pipe Hanger Support FCR's, Watts Bar Nuclear Plant 1980-1981 Design Draftsman and Project Control Technician, U.S.
TVA, Knoxville, Tennessee Architectural Design Branch 1972-1979 Design Draftsman, U.S. TVA, Knoxville, Tennessee,
Site Planning Section, Division of Reservoir Properties / and later with Land
and Forest Resources, Land Administration Branch EDUCATION BS Degree in
Education, 1982 - The University of Tennessee - Knoxville, Tennessee. AS Degree in
Design Drafting with a Minor in Management, 1972 - Cleveland State Community
College, Cleveland, Tennessee. DOE Certified
Project Control Engineer in DOE Order 2250 (CSCSC) for PICS (Project
Integrated Control System) (Training received at Savannah River Nuclear Site
in spring of 1991) W.A.M.P. 40 hour program
for Engineering Manager Certification (May, 2005) Flight Training, Augusta
Aviation, Augusta Ga. Licensed Private Pilot. PROGCTRL/RESUMES/GSGcurrentNov09.doc/062696
1 of 6 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|